BCT 2770 Construction Estimating

Involves systems of accounting, material inventory, and the critical path method of planning and scheduling. Designed specifically for cost estimating in heavy construction, but upon completion, the student should have no trouble doing light construction or commercial estimating. Completion of, or simultaneous enrollment in, ETD 1399 or the ability to read blueprints will aid the student. Some computer-assisted estimating is used.

Credits

3 cc

Prerequisite

BCN 1001.

Corequisite

MAT 1033C or MAC 1105.

Offered

FA.

Notes

AS only. Lab Fee.
.